Return to
Meetings and Minutes Main Page
West Vincent Township
Board of Supervisors Meeting
July 14, 2008 7:30 PM
Attendance: Chairman
Kenneth Miller, Vice Chairperson Zoë Perkins , Barry DiLibero, Township Manager
Jim Wendelgass, Allan Greenwood of Siana, Bellwoar & McAndrew, LLP Township
Solicitor, Alberto Vennettilli, P.E. representative of Township Engineer,
Carroll Engineering, and Township Secretary
The first item of business was a Conditional Use Hearing for
Chairman Miller called the hearing to order at 7:33 PM and
turned it over to Township Solicitor Greenwood.
The following exhibits were entered into evidence: B-1:
Proof of Publication; B-2: Copy
of the notice that was advertised; B-3:
A list of the persons within 500’ of the property; B-4: A copy of the form of notice that went out to
those persons; B-5: A copy of the
Township Engineer’s report dated 4/16/08; B-6:
A copy of the Application for a
Conditional Use along with a set of plans.
Chairman Miller opened the regular Township Meeting at 9:17 PM.
The first item of business was to open the bids for the 2008 Road Repair, Maintenance and Labor. Six (6) bids were received along with an
e-mail to the Board dated 7/14/08 from Dave Monteith, Birchrun Excavating
thanking the Board for the opportunity to bid, but declining to bid at this
time. The bids and their amounts are
attached to these minutes. DiLibero
stated that he was looking for information on whether the winning bidder needed
a performance bond. He called PSATS and
someone there told him that there needed to be a bond.
The minutes of June 16, 2008 were unanimously approved as amended on a motion by Perkins and a second by DiLibero.
Reports:
Township Manager Report: The Township Manager Report for the week ending 7/12/08 was acknowledged as submitted.
Road Master Report: Kenneth Miller gave his report for the last three (3) weeks ending 7/11/08 which was acknowledged as received.
Active Subdivision List: There are currently no pending deadlines.
Bills List: The Bills List was reviewed. Perkins made the motion to approve the Bills List dated 7/11/08 in the total amount $44,832.70. DiLibero seconded the motion and it carried unanimously.
Correspondence:
A letter was received from
Subdivision/Land Development:
Old Business:
A Final Draft has been received of the Federation of
New Business:
An Escrow Release Request has been received from Joseph Purcell,
Business from the floor:
Jim Hall, Weatherstone HOA President asked when the No Parking signs were to be installed. Miller stated that the signs have been delivered to the Township and the Road Crew is getting ready to install them. A PA One Call is necessary to be made and there will be paint lines on the street after that is submitted. Miller stated that once the lines are sprayed and a resident has a problem with a location to contact him as soon as possible to see if an alternative location can be found. The Speed Limit and Stop signs will be installed at the same time.
DiLibero asked if the Township has been in contact with Jordan Perry, Chester County Conservation District regarding the Ewell property. Arthur Ewell, 972 Fellowship Road, Tax Parcel 25-7-31 is trying to determine whether he needs a permit to replace a swale with a pipe to a creek and has not been able to do so. Wendelgass stated that he has tried several times to get someone and has had not been successful.
DiLibero wanted to know if Dewees Lane was going to be oiled all the way to the end this year. Miller informed him that this was the plan and that it may be as soon as the end of this week that it gets soybean oil applied.
Perkins made a motion to adjourn, DiLibero seconded, and the motion passed unanimously.
Meeting Adjourned 10:00 PM
Respectfully Submitted,
Township Secretary
|
|
Equipment estimated on an hourly usage of 50 hours per item with operator |
Harold E. Trego Const. Co., Inc. |
R. W. Fetters, Inc. |
Dan Malloy Paving, Inc. |
|
|
|
Non Prevailing Wage/Prevailing |
Non Prevailing Wage/Prevailing |
Non Prevailing Wage/Prevailing |
|
1. |
Ingersoll-Rand 575 Track Paver |
$100.00/$125.00 |
$100.00/$125.00 |
$150.00/$190.00 |
|
2. |
J. D. 310SE 4x4 Extendahoe Back Hoe Loader |
$85.00/$115.00 |
$79.00/$110.00 |
$70.00/$100.00 |
|
3. |
Ingersoll-Rand DD Roller |
$65.00/$80.00 |
$64.00/$79.00 |
$60.00/$85.00 |
|
4. |
Tandem Axle Dump Truck GVW 57,000 lbs. |
$65.00/$80.00 |
$65.00/$80.00 |
$80.00/$105.00 |
|
5. |
Ingersoll-Rand SP-48 Roller |
$65.00/$80.00 |
$64.00/$79.00 |
$60.00/85.00 |
|
6. |
Single Axle Dump Truck GVW 38,000 lbs |
No bid |
$63.00/$78.00 |
$65.00/$90.00 |
|
7. |
|
$125.00/$150.00 |
$123.00/$150.00 |
$75.00/$105.00 |
|
8. |
Mustang MTL 20 Track Skid Steer |
$85.00/$100.00 |
$80.00/$95.00 |
$60.00/$85.00 |
|
9. |
Ingersoll-Rand DD65 Roller |
$85.00/$100.00 |
$79.00/$99.00 |
$60.00/$85.00 |
|
|
|
|
|
|
|
|
Labor |
$50.00/$75.00 |
$43.00/$68.00 |
$35.00/$58.00 |
|
|
|
|
|
|
|
|
Equipment delivered to site without operator per day |
|
|
|
|
1. |
Plate Tamper |
$75.00 |
$74.00 |
$50.00 |
|
2. |
Chop saw with diamond cutting blade |
No bid |
$64.00 |
$125.00 |
|
|
Equipment estimated on an hourly usage of 50 hours per item with operator |
Macanga Paving Contractors 919 Camaro Run |
D.L. Fleck Paving and Excavating Inc. |
960 Pottstown Pike |
|
|
|
Non Prevailing Wage/Prevailing |
Non Prevailing Wage/Prevailing |
Non Prevailing Wage/Prevailing |
|
1. |
Ingersoll-Rand 575 Track Paver |
$160.00/$192.50 |
$95.00/$105.00 |
$340.00/$415.00 |
|
2. |
J. D. 310SE 4x4 Extendahoe Back Hoe Loader |
$85.00/$117.50 |
$79.50/$89.50 |
$220.00/$245.00 |
|
3. |
Ingersoll-Rand DD Roller |
$100.00/$132.50 |
$42.50/$62.50 |
$135.00/160.00 |
|
4. |
Tandem Axle Dump Truck GVW 57,000 lbs. |
$80.00/$104.00 |
$72.50/$87.50 |
$80.00/$110.00 |
|
5. |
Ingersoll-Rand SP-48 Roller |
$100.00/$132.50 |
$42.50/62.50 |
$155.00/$180.00 |
|
6. |
Single Axle Dump Truck GVW 38,000 lbs |
$80.00/$104.00 |
$62.50/$71.50 |
$75.00/$95.00 |
|
7. |
|
$150.00/$182.50 |
$120.00/$135.00 |
$273.00/$298.00 |
|
8. |
Mustang MTL 20 Track Skid Steer |
$97.50/$120.00 |
$75.00/$85.00 |
$218.00/$243.00 |
|
9. |
Ingersoll-Rand DD65 Roller |
$100.00/$132.50 |
$68.50/$78.50 |
$145.00/$170.00 |
|
|
|
|
|
|
|
|
Labor |
$35.00/$56.00 |
$39.50/$58.50 |
$50.00/$75.00 |
|
|
|
|
|
|
|
|
Equipment delivered to site without operator per day |
|
|
|
|
1. |
Plate Tamper |
$25.00 |
$65.00 |
$120.00 |
|
2. |
Chop saw with diamond cutting blade |
$50.00 |
$95.00 |
$175.00 |